NM Group uses PLS-CADD, PLS-POLE, and PLS-TOWER to develop engineering models that support overhead line design, transmission line modelling, network uprating, asset assessment, and infrastructure development projects.

Speak to the Team

Overhead Line Engineering

Modelling overhead lines under real-world conditions.

Transmission and distribution networks operate across complex terrain, varying environmental conditions, and ageing infrastructure.

Our engineering models help utilities assess conductor behaviour, structural loading, clearance performance, and network constraints with greater confidence, supporting practical decisions around design, uprating, and asset assessment.

Talk with Our Team

FAQs

Model accuracy depends on the quality of the source data. By combining engineering expertise with high-quality survey and LiDAR datasets, utilities can develop highly accurate models suitable for engineering assessment, design, and validation.

Yes. PLS-CADD can model conductor behaviour under different loading and environmental conditions, helping utilities assess clearances, operating temperatures, and network performance.

Yes. NM Group develops engineering models for both transmission and distribution infrastructure, supporting new line design, uprating, refurbishment, and asset assessment projects.

Yes. Engineering models can be used to assess existing network capability, identify operational constraints, and evaluate opportunities to increase capacity while maintaining safety and compliance.

Talk to Our Team

Ready to improve the accuracy and confidence of your overhead line engineering projects?

Our specialists support utilities, network operators, and engineering teams with PLS-CADD modelling and engineering analysis across transmission and distribution networks.

Contact Us