Posted

We will be supporting the design work for a new powerline by surveying the proposed route in the North West of England. The survey will also include coverage of a tidal area requiring us to generate detailed maps at low tide. The results will allow the client to ensure the most cost-effective tower alignment and lower Bill of Quantities costs. For more of our latest news and information follow us on LinkedIn.