Posted

We are supporting a long standing client in Kentucky with 3D CAD models to check for facility changes on their power network. This is a crucial part of ensuring compliance with NERC FAC-008. We employ the use of the latest survey equipment and processing analysis to identify any thermal constraints on the network. This can then be displayed via maps, reports and in spatial formats for ease of use within the utility.   NM Group senior engineering department has over 25 years experience in powerline engineering and modeling. Find out more about our modeling and engineering heritage and expertise by clicking here