New transmission line project uses geospatial modelling

Posted

A major North-Eastern transmission utility has commissioned a new undertaking to capture 23 miles of power line corridor. The project will use LiDAR and image data to develop mapping products and PLS-CADD based analysis that will support the design of a new transmission line.

Explore how geospatial data can support the planning and design of new lines.