Posted

We are very pleased to have been awarded a project to a new US client to deliver a 35 mile transmission project in the Southeast. The project will require aerial LiDAR data for sections of the 115kV and 230kV where we will deliver PLS-CADD models and reports confirming the as-built thermal ratings. We will also identify any thermal constraints on the line to ensure safety and reliability for our client.   To read more about our thermal rating confirmation process click here